CN112050021A
|
|
On-site repairing method of JPCCP (joint sealing gasket pipe)
|
CN112065491A
|
|
Tunnel construction ventilation method
|
CN112065492A
|
|
Synchronous operation rack for tunnel excavation construction and synchronous construction method
|
CN111946367A
|
|
Grouting reinforcement method for tunnel passing through water-rich fault
|
CN111946356A
|
|
Ultra-long distance hard rock pipe jacking construction method
|
CN111946355A
|
|
Construction method for long-distance rock jacking pipe to penetrate through water-rich fault
|
CN111878095A
|
|
Construction method for existing underground structure of newly-built channel connection without reserved interface
|
CN111749224A
|
|
Soft basic reinforced structure in rich water quicksand layer
|
CN111779266A
|
|
Stair are pour construction and are used rotatory aluminium mould of combination
|
CN111878084A
|
|
Rapid treatment method for controlling surface subsidence by using large-diameter shield construction in case of meeting stratum funnel
|
CN111734435A
|
|
Anti-bias method for surrounding locking leg of self-advancing long anchor rod of advanced pipe shed and arch frame
|
CN111720134A
|
|
Method for replacing TBM cutter head in hole without enlarging hole
|
CN111677517A
|
|
Method for entering tunnel into main tunnel by tunnel auxiliary pilot pit
|
CN111948165A
|
|
Method for detecting hypochlorite ions of construction material based on optical probe
|
CN111948164A
|
|
Method for detecting construction material sulfate radical based on optical probe
|
CN111691895A
|
|
Soft-crushing movable large-bias-pressure wet carbonaceous shale tunnel soft-hard double-layer primary support excavation method
|
CN111593676A
|
|
Construction method of thin-wall hollow pier
|
CN111691894A
|
|
Construction process of hole pipe shed
|
CN111764288A
|
|
Rack falling device and rack falling method
|
CN111810163A
|
|
Nine-lane double-arch construction method for underground excavation through underground longitudinal and transverse channels
|