CN112228079A
|
|
Construction method for newly-built tunnel to span existing line at small angle
|
CN112049020A
|
|
Method for vertically installing large steel pipe upright post
|
CN112194420A
|
|
Water-dilution-resistant synchronous grouting liquid for water-rich geological shield construction and preparation method thereof
|
CN112228076A
|
|
Fast excavation construction method for hard rock large-span tunnel
|
CN112049218A
|
|
Municipal concrete drainage pipeline laying construction method
|
CN111719610A
|
|
Larsen steel sheet pile in-groove soil cleaning machine and using method
|
CN111520173A
|
|
Large-section tunnel secondary lining steel bar vault fixing device and construction method thereof
|
CN111519544A
|
|
Bridge flange plate construction formwork support system
|
CN111519896A
|
|
Self-propelled truss supporting template
|
CN110794478A
|
|
Comprehensive detection method for harmful gas in non-coal measure stratum tunnel
|
CN110864592A
|
|
Underground engineering poison-reducing blasting construction method for generating toxic and harmful gases
|
CN110863858A
|
|
Outburst prevention control program and outburst prevention method for high-pressure harmful gas of non-coal-series stratum tunnel
|
CN110792478A
|
|
Omnibearing monitoring method for various mixed harmful gases in non-coal measure stratum tunnel
|
CN110716015A
|
|
Wireless relay transmission system for tunnel environment monitoring data
|
CN109653222A
|
|
Friction pile means of defence, anti-slide pile construction method and friction pile safeguard structure
|
CN109578027A
|
|
Upper-soft lower-hard ground tunnel excavation support structure and tunnel excavation construction method
|
CN109538236A
|
|
A kind of tunnel structure and tunnel construction method
|
CN107956484A
|
|
The ruggedized construction and construction method of existing shield tunnel Deformation control
|