CN112228117A
|
|
Construction method for large-section primary support large arch springing
|
CN112228123A
|
|
Arch mounting machine installation arch construction method applied to large-section arch
|
CN112253147A
|
|
Shield construction method for soft silt stratum
|
CN112253175A
|
|
A model for partition wall concrete placement in double arch tunnel
|
CN112127398A
|
|
Excavator bucket auxiliary device
|
CN112253136A
|
|
Intelligent excavation method for large-section tunnel of high-speed railway
|
CN112228116A
|
|
Construction method for synchronous slurry supplement in shield construction of water-rich stratum
|
CN112281888A
|
|
Excavation supporting method for foundation pit caisson
|
CN112281882A
|
|
Method for treating water and sand gushing from substrate
|
CN112067514A
|
|
Soil particle size detection method, system and medium based on geotechnical screening test
|
CN111705775A
|
|
Highway engineering roadbed compactness field detection device
|
CN111795207A
|
|
Construction method for oversized starting well top pipe
|
CN111810712A
|
|
Push pipe starting construction method for bent pipeline
|
CN111779487A
|
|
Construction method of end well of automatic footpath
|
CN111794109A
|
|
Large-span bridge fabrication machine and continuous hole passing process method for large-span combined beam
|
CN111708091A
|
|
Geological radar real-time detection alarm system and method
|
CN111778860A
|
|
Process method for assembling sections of high-speed rail bridge
|
CN111730757A
|
|
Energy-conserving concrete water-reducing agent's of excelling in blending device
|
CN111702942A
|
|
Railway bridge deck auxiliary structure integral prefabrication production line and production process thereof
|
CN111767599A
|
|
Direct elastic resistance method applied to initial structural design of tunnel
|