CN111851576A
|
|
Template support system for tunnel construction
|
CN111519679A
|
|
Rapid grooving construction method for micro-weathering rock of diaphragm wall
|
CN111547976A
|
|
Mud-rock residue soil mud-water separation construction method
|
CN111502678A
|
|
Method for forming mud film of slurry shield in highly permeable stratum
|
CN111626575A
|
|
Construction safety quality hidden danger management method based on internet environment
|
CN111255478A
|
|
Movable trolley supporting structure
|
CN111255468A
|
|
Double-shield TBM small-clear-distance tunnel construction method
|
CN111236947A
|
|
Construction method of vertical freezing subway shaft
|
CN111305215A
|
|
Bentonite slurry mixing proportion blending method in underground continuous wall construction
|
CN111270565A
|
|
Ballastless track in high-speed rail turnout area and anti-cracking construction method thereof
|
CN111350509A
|
|
Muck improvement and grouting method for sandy gravel stratum tunnel shield construction
|
CN111101958A
|
|
Construction method for tunnel shield interval lower penetrating and winding city
|
CN111156009A
|
|
Construction and monitoring method for tunnel shield underpass viaduct
|
CN111335904A
|
|
Shield downward-penetrating building construction monitoring method
|
CN111156008A
|
|
Shield construction and monitoring method for dangerous source river electric power tunnel
|
CN111075460A
|
|
Shield construction and monitoring method for urban dense building
|
CN111173522A
|
|
Construction method for hoisting and descending air shaft shield machine
|
CN111156006A
|
|
Construction method for shield underpass of dangerous pipeline
|
CN110984221A
|
|
Construction method for reinforcing end socket at initial end of air shaft and guide wall structure
|
CN110820752A
|
|
Bottom plate steel bar system and shield well foundation pit main structure construction method comprising same
|