CN112282779A
|
|
Long-distance open type TBM (tunnel boring machine) single-head tunneling small-section quick dismantling system and construction method
|
CN112282805A
|
|
Intelligent reinforcing trolley for mine method tunnel
|
CN112282769A
|
|
Shield tunneling tunnel face stratum distribution monitoring method based on cutter rotating speed ratio
|
CN112282778A
|
|
Shield cutter head cutter wear diagnosis method and application thereof
|
CN112246407A
|
|
Device capable of producing abrasive materials with different particle sizes
|
CN112196574A
|
|
High-pressure water jet device for assisting tunneling machine in rock breaking
|
CN112196573A
|
|
Water jet pipeline system for rock breaking of tunneling machine
|
CN112146867A
|
|
Simulation experiment platform for compounding high-pressure water jet with hob
|
CN112252332A
|
|
Grooving construction method for underground diaphragm wall of ultra-deep shaft
|
CN112196556A
|
|
Method for collecting relevant parameters of tunnel boring machine by using black box
|
CN112177619A
|
|
Two gas pressurize control system that act on of muddy water shield
|
CN112177624A
|
|
Load monitoring device for shield TBM cutter hob seat bolt and using method thereof
|
CN112177623A
|
|
TBM (Tunnel boring machine) grading construction method for stratum tunnels with different water-rich crushing degrees
|
CN111997655A
|
|
Construction method of concrete double-lining formwork trolley capable of rotating in tunnel
|
CN112071182A
|
|
Visual test box for half-section tunneling of miniature tunneling machine
|
CN112065413A
|
|
Shield partition plate for maintaining stability of slurry in bin for slurry shield
|
CN111997649A
|
|
Tunnel-first post-station underground excavation station segment removal construction method and segment removal tool used by same
|
CN112160760A
|
|
Construction method for coping with accumulated slag in large-diameter slurry shield cabin
|
CN112031784A
|
|
Shield tail detection and repair method
|
CN112031782A
|
|
Detection device of shield machine
|