CN112252339A
|
|
Upward full-length bonding anchor cable hole subsection grout stopping structure and method
|
CN112196590A
|
|
Node processing method for enabling anchor rods to penetrate through lining waterproof layer in large-range intensive mode
|
CN112095664A
|
|
Prestressed full-length anchoring mortar anchor rod for underground cave depot and rapid anchoring tensioning method
|
CN112112676A
|
|
Secondary grouting and primary tensioning structure for anchor cable without bonding in hole and construction method
|
CN112195941A
|
|
Quick installation method for overlong vertical upward prestressed anchor cable of underground cave depot
|
CN112240207A
|
|
Jumbo-span cave depot lattice jumping excavation and rapid bottom turning method
|
CN112227370A
|
|
Continuous casting method for preventing arch part cracking of large-volume concrete of large-span underground cavern
|
CN111550270A
|
|
Ultra-large self-propelled tunnel multifunctional operation platform and tunnel steel bar waterproof board construction method
|
CN111456764A
|
|
Heavy lining trolley with pushing sliding type disc buckle support and lining formwork construction method
|
CN111287755A
|
|
Method for improving excavation stability of tunnel body of aeolian sand stratum
|
CN111220036A
|
|
Blasting method for pilot tunnel at lower section of vertical shaft water curtain roadway
|
CN110748349A
|
|
Double-molecular originating method for small-clear-distance double-line tunnel shield
|
CN110714765A
|
|
Construction method for post-construction air shaft of shield interval
|
CN110500126A
|
|
Hollow bolt filling adaptor and hollow bolt construction technology
|
CN110630325A
|
|
Draining method for long-distance tunnel by utilizing horizontal directional drilling
|
CN110617105A
|
|
Draining structure of deep-buried rich water broken belt long-distance tunnel
|
CN110295912A
|
|
The sensitive non-quick-fried efficient excavating load of the good hard rock large cross-section tunnel of location integrality
|
CN110219654A
|
|
The leading construction method of mud stone multiple-arch tunnel side pilot tunnel
|
CN110159207A
|
|
A kind of drilling equipment for ultra-deep horizontal drilling of constructing
|
CN110029948A
|
|
Drill bit erection device for long range horizontal drilling of constructing
|