CN104653190A
|
|
Full-face gravel bed earth pressure balanced shield tunnel engineering method
|
CN104652302A
|
|
Advancing construction method of ultralarge pipe roofing box culvert
|
CN104653186A
|
|
Method of earth pressure balance shield crossing reinforced concrete pile foundation building
|
CN104652425A
|
|
Technical method for reinforcing soil of shield end well through bamboo reinforcement concrete pouring pile
|
CN104655092A
|
|
Triangular single well directional measurement method used in subway shield construction
|
CN104655099A
|
|
Safe settlement observing method
|
CN104652457A
|
|
Construction method for Larsen sheet pile cofferdam for foundation pit of Haihe river
|
CN104653189A
|
|
Whole-covering type horizontal freezing method end soil reinforcement shield tunnel-entering construction method
|
CN102797483A
|
|
Pile casing and water-rich strata shield pile casing receiving method
|
CN102606163A
|
|
Shield tunnel construction ground settlement control method
|
CN102619522A
|
|
Construction method for subway contact passage
|