CN107151980A
|
|
Large-span Steel Box Beam liftable self-propelled successively incremeantal launching method system and its construction method
|
CN106988749A
|
|
Speciality construction of Diversion Tunnels engineering method under superelevation Geothermal Conditions
|
CN106921126A
|
|
A kind of integrated cable burying machine and its construction
|
CN106894821A
|
|
It is a kind of originate, the monitoring method of received well and jacking construction
|
CN106801612A
|
|
A kind of T76S high intensity self-drilling type barrel vault advanced support engineering method
|
CN106192967A
|
|
A kind of for installing fixing soil pressure cell device and method in jacking pipe joints
|
CN106150523A
|
|
A kind of Railway Tunnel ditch cable trench integral mold plate construction
|
CN106223960A
|
|
High ferro major long tunnel inverted arch moves integrally mould bases construction
|
CN105970980A
|
|
Weak surrounding rock four-wire super large section railway tunnel construction method
|
CN105507337A
|
|
Construction process combining high-pressure jet grouting pile with precipitation construction interconnecting channel
|
CN105370315A
|
|
Drainage construction technology for seasonally-frozen ground tunnel
|