CN112145183A
|
|
Construction method for upward excavation of shallow-buried weak surrounding rock steep slope tunnel
|
CN112145195A
|
|
Construction method of double-layer orthogonal frame culvert in underground excavation station
|
CN112252187A
|
|
In-situ scattered assembling and hoisting method for steel box girder
|
CN112033461A
|
|
Multi-point continuous measuring device and method for large-span concrete beam
|
CN112195797A
|
|
Closure construction method for continuous beam bridge
|
CN111962504A
|
|
Construction method for covering and digging top-down permanent steel pipe column
|
CN111732001A
|
|
Suspension cable hoisting structure and method for prefabricated part in steep valley terrain
|
CN111908824A
|
|
Composite concrete admixture and preparation method and application thereof
|
CN111847958A
|
|
Composite retarding material and preparation method thereof
|
CN111622778A
|
|
Large-span tunnel lining subassembly
|
CN111472278A
|
|
Intelligent bridge maintenance system and method
|
CN111305879A
|
|
Excavation supporting method of arched straight wall type tunnel
|
CN110284890A
|
|
A kind of clast stream formation tunnel excavation construction method and structure
|
CN110193550A
|
|
A kind of rotary moving fashioned iron hole punched device
|
CN110006335A
|
|
A kind of near region Tunnel Blasting vibration dynamic strain test method suitable in built tunnel
|
CN109488311A
|
|
A kind of Three-arched tunnel construction method
|
CN109209388A
|
|
A kind of Construction of Silo plate device
|
CN108755438A
|
|
A kind of Y types pier Construction of continuous beam π types holder and its construction method of installation
|
CN108129110A
|
|
A kind of high-speed railway large cross-section tunnel prestressed cable anchorage paste materials
|