CN112281812A
|
|
Construction process of underground continuous wall
|
CN112282438A
|
|
Quick-building pumping irrigation station
|
CN112211809A
|
|
Full-automatic water pumping equipment with automatic water level and elevation control
|
CN112282013A
|
|
Urban road sponge system
|
CN111350522A
|
|
Reinforcing system for damaged segments of subway communication channel in construction period and construction method
|
CN110284901A
|
|
Water proof type single shell lining structure and its construction technology
|
CN110205947A
|
|
A kind of overline bridge steel box girder construction method
|
CN110335173A
|
|
Based on BIM construction management platform and comprehensive monitoring system
|
CN110260721A
|
|
Marl stratum high pressure pneumatic component method within the scope of railway protective
|
CN110306531A
|
|
High water level erratic boulder stratum construction of diaphragm wall technique
|
CN110173280A
|
|
Injection slurry and its methods for making and using same suitable for the backfill of diversion tunnel secondary lining
|
CN110397079A
|
|
Marine facies rich water karst strata open-cut station construction technology
|
CN110259466A
|
|
A kind of subway station water-rich sand layer big cross section shield-tunneling construction technique
|
CN110306585A
|
|
A kind of cushion cap and cover board construction method
|
CN110331992A
|
|
A kind of hole daguanpeng construction method
|
CN110306593A
|
|
A kind of station construction method
|
CN110306571A
|
|
A kind of cutting excavation construction method
|
CN109740904A
|
|
A kind of BIM construction management system
|
CN109723373A
|
|
A kind of light weathered granite stratum rotary digging drilling hole bored concrete pile construction method
|
CN109457710A
|
|
A kind of plain fill deep basal pit combined type soil nail wall and construction method for supporting
|