CN111578026A
|
|
Under-pressure cutting construction method for water supply pipelines made of different materials
|
CN111255466A
|
|
Construction method for single shaft starting by changing tunnel into shield by mining method
|
CN110965584A
|
|
Access and exit earthwork excavation and passage opening concrete breaking synchronous construction method
|
CN110988992A
|
|
Advanced geological forecasting method for mining method construction
|
CN110965581A
|
|
Protection construction method for underground pipeline in subway construction
|
CN110985021A
|
|
Long-distance river-crossing construction method for earth pressure balance shield
|
CN110761800A
|
|
Air-assisted launching construction method of launching well in underground excavation tunnel shield machine
|
CN111042166A
|
|
Spiral plugging device and method for deep foundation pit dewatering well
|
CN110792441A
|
|
Construction method for treating deep-buried cross-foundation pit waste pipeline
|
CN110777860A
|
|
Method for grouting and plugging back of side wall leakage water of subway station
|
CN110080301A
|
|
A kind of construction method that subway station underground continuous wall-enclosure structure punches
|
CN109973116A
|
|
A kind of tunnel segment structure and its construction method of the anti-floating of shield tunnel
|
CN109680690A
|
|
Diaphram wall steel reinforcement cage merogenesis construction method for hanging under low-headroom condition
|
CN108867693A
|
|
The construction method of existing pipe gallery reinforcement protection
|
CN108867692A
|
|
The protection of city big cross section open trench tunnel Nearby Structure and tunnel foundation pit method for digging
|
CN108951648A
|
|
Open trench tunnel layer of sand Sand foundation ditch strengthening method
|
CN108843346A
|
|
Lining construction method of the large section shallow-depth-excavation tunnel in water-rich sand layer
|
CN108952765A
|
|
Construction method of the super steel tube shed in water-rich sand layer advance support
|
CN108951647A
|
|
Construction method for supporting is excavated in hole in the hole of open trench tunnel
|
CN108910708A
|
|
Safety management system and method for managing security in processing factory
|