KR20140080472A
|
|
Method of construction of line type supports at large section tunnel having low flat rate
|
KR20140007309A
|
|
Method of pre-supported tunnel costructed in a soft ground
|
KR20130082134A
|
|
Pre-support tunneling reinforced by in-situ soil mixed with cement
|
KR20130108218A
|
|
Method of reinforcement and construction of pillar of neighboring tunnel
|
KR20140067787A
|
|
Removable tendon cable type anchor
|
KR20120079987A
|
|
Method of pre-support tunneling reinforced by in-situ soil mixed with cement
|
KR20120060952A
|
|
Method of construct a pre-support tunnel by proper installing pre-supporter
|
KR20110020401A
|
|
Excavation method for pre-nailed tunneling
|
KR20110005577A
|
|
Pre-stressing tunneling method using presupport concept and thereof apparatus
|
KR20100118269A
|
|
Plural support anchor of extension wedged type by expansion of spring
|
KR20100029303A
|
|
Method forming a root constructure by high presure grouting
|