CN112252135A
|
|
Prefabricated integrated pipeline combined side mold and construction method
|
CN112119795A
|
|
Vegetation device and construction method
|
CN112031389A
|
|
Automatic assembling system for adjustable support of coil buckle type scaffold
|
CN111878100A
|
|
Screw machine anti-gushing structure and method for shield construction
|
CN111926862A
|
|
Underground water drainage ecological protection system and construction method
|
CN111828090A
|
|
Method for determining tunnel mud gushing dredging back pressure backfill thickness
|
CN111733852A
|
|
Waterproof curtain structure for replacement construction between gravel stratum supporting piles and construction process
|
CN111878132A
|
|
Foot locking anchor rod lengthening device and underground excavation tunnel steel arch frame anti-arch-falling settlement construction method
|
CN111877461A
|
|
Novel groundwater recharge structure and construction process
|
CN111875289A
|
|
Application of asphalt station recycled powder in shield construction
|
CN111733878A
|
|
Full-prefabricated assembled superposed comprehensive pipe gallery supporting construction structure and process
|
CN111622059A
|
|
Rainwater hopper combined internal mold and rainwater hopper pouring construction process
|
CN111560858A
|
|
Novel stride high-speed steel case roof beam integral type anticollision wall exterior sheathing
|
CN111502704A
|
|
Ultra-long-distance secondary grouting system and process for shield construction
|
CN111485582A
|
|
Road weak current inspection well and weak current pipeline nested structure and construction method
|
CN111441802A
|
|
Temporary inverted arch dismantling replacement structure and process in tunnel constructed by CRD method
|
CN111254806A
|
|
Cable-stayed bridge with inhaul cables staggered in bridge direction and obliquely supported circular tower and construction method
|
CN111058872A
|
|
Tunnel primary support structure of steel arch and construction method
|
CN110985042A
|
|
Urban comprehensive pipe gallery and underground shallow-buried underground tunnel combined supporting system and process
|
CN111101970A
|
|
Prefabricated cushion block connecting beam structure erected in soft soil layer tunnel and construction method
|