CN112253151A
|
|
Ultra-deep circular shaft double-line shield split starting construction method
|
CN112252466A
|
|
Crack prevention construction method for layered concrete structure
|
CN112031791A
|
|
Disassembling method of shield machine in limited space
|
CN111663568A
|
|
Ultra-deep circular shaft lining wall formwork structure and construction method thereof
|
CN111579753A
|
|
Tube sheet wall post-grouting body core-pulling inspection device and inspection method thereof
|
CN111608435A
|
|
Subway station and viaduct combined construction structure and construction method thereof
|
CN111488404A
|
|
Method for rapidly compiling monitoring report in Excel
|
CN111101540A
|
|
Construction method for passing existing electric power tunnel on open cut tunnel
|
CN110629748A
|
|
Anti structure that floats of bored concrete pile steel reinforcement cage
|
CN110510367A
|
|
A kind of active belt regulating device
|
CN110593254A
|
|
Construction method of cast-in-situ bored pile in stratum with karst cave in joint zone
|
CN109839496A
|
|
A kind of tail seal grease of shield height emulation detection device and detection method
|
CN109441459A
|
|
A kind of earth pressure balanced shield separate launching side excavating construction method
|
CN109057806A
|
|
A kind of development machine clay delivery pump method for correcting error
|
CN108868792A
|
|
Tail sealing brush and tail sealing structure
|
CN107575239A
|
|
A kind of portable shield launching device for small space
|
CN107642364A
|
|
Tunneling boring mud jacking shield construction method in rich water rock stratum under sensitivity building
|