CN111878136A
|
|
Sectional type hollow drainage prestress yielding anchor rod and supporting method thereof
|
CN111859814A
|
|
Rock aging deformation prediction method and system based on LSTM deep learning
|
CN111676910A
|
|
Overflow meter hole working gate overhauling structure and detection method
|
CN111676909A
|
|
Movable radial gate locking device
|
CN111764943A
|
|
Drainable self-drilling grading yielding anchor rod and supporting method thereof
|
CN111881601A
|
|
Earth and rockfill dam material constitutive model construction method based on deep learning and finite element unit method
|
CN111861137A
|
|
Parallel multi-target scheduling method for cascade reservoir groups
|
CN111860967A
|
|
General hydropower station group topological graph generation method based on improved graph theory algorithm and application
|
CN111648307A
|
|
Underwater unmanned blocking construction process for leakage of reservoir dam
|
CN111862265A
|
|
Hydropower station water storage period scheduling graph compilation method based on water level control and application
|
CN111559434A
|
|
Dark culvert detection crawler crawling robot
|
CN111546360A
|
|
Hidden culvert detection crawling robot
|
CN111680460A
|
|
Method for determining flow coefficient of hydraulic automatic flap gate
|
CN111680703A
|
|
360-degree construction panorama linkage positioning method based on image feature point detection and matching
|
CN111506949A
|
|
BIM-based visualization method for road soft foundation treatment construction progress
|
CN111489441A
|
|
Method and device for converting FDB three-dimensional model into UDB three-dimensional model
|
CN111462469A
|
|
Multi-channel acquisition terminal
|
CN111287151A
|
|
Novel panel structure of panel rock-fill dam with self-pressurizing water stopping function
|
CN111462320A
|
|
Automatic two-zone plot batch generation method based on constrained Delaunay triangulation network
|
CN111462305A
|
|
Three-dimensional real estate management method applied to rural house-ground integration
|