CN111980718A
|
|
Tunneling method for small-radius turning and downward penetrating of building of shield tunneling machine
|
CN111734444A
|
|
Construction method of shield segment grouting reinforcement structure close to existing line
|
CN111648791A
|
|
Excavation supporting structure and construction method of tunnel
|
CN111626623A
|
|
Method for controlling cutter changing of shield machine hob in composite stratum
|
CN111608690A
|
|
Triple-pipe high-pressure jet grouting pile construction method suitable for water-rich sand layer
|
CN111456087A
|
|
Basement structure regional small-section earthwork excavation method
|
CN111335672A
|
|
Diamond wire saw cutting construction method
|
CN110952454A
|
|
Automatic guniting equipment for tunnel and bridge construction
|
CN110500104A
|
|
A kind of shield machine crosses the propulsion method of shallow-depth-excavation tunnel
|
CN110528846A
|
|
A kind of scaffold for railway tunnel maintenance
|
CN110295539A
|
|
A kind of high thin-wall reinforced concrete structure and construction method of overturn-preventing
|
CN110374624A
|
|
A kind of connection channel construction method constructed by tunneling shield
|
CN110331627A
|
|
A method of for locked III plate of non-fragment orbit quick-replaceable CRTS of high-speed railway
|
CN110206290A
|
|
Wine library overhanging scaffold construction method
|
CN109881900A
|
|
One kind is for concrete perfusion winter construction lagging facility in steel tube arch rib
|
CN109797667A
|
|
A kind of multi-functional culvert and its method for prefabricating, construction method
|
CN109668487A
|
|
Micro-vibration rock and soil blasting controls construction method
|
CN108446255A
|
|
Gummy formation sediment improvement foaming agent additive amount determines method
|
CN107460795A
|
|
Existing railway station changes track switch whole group in enclosed point and changes construction technology
|
CN107059649A
|
|
A kind of supporting bridge pinner concrete curing cover and its maintenance process
|