AU6014299A
|
|
Method of approach for soil reinforcement foudation or soil anchorage and adviseto realise the method
|
FI944511A0
|
|
Construction procedure and building elements
|
EP0215838A1
|
|
A method in the installation of piles and apparatus for carrying out the method.
|
SE8400260D0
|
|
Tractive load absorption method for concrete joists
|
WO8303275A1
|
|
Method of bearing a metal sheet roof and roof structure for carrying out the method
|
SE8300260D0
|
|
Tractive load absorption method for concrete joists
|
SE8204794D0
|
|
Procedure for producing concrete beams and construction element for execution of the procedure
|
FI822212A0
|
|
Foerfarande foer oeverfoering av belastning fraon byggnadsverk till paole samt anordning foer utfoefoerfarandet
|
SE8008977L
|
|
Procedure for the transfer of a load from a constructional work to a pile and a device for executing the procedure.
|
SE437176B
|
|
Process for producing concrete slabs, deck supported by pillars, beams and similar and structural elements for executing the process.
|
SE7909049L
|
|
Method for reinforcing an existing floor structure and a device for working the method
|