KR101618723B1
|
|
Reinforcing structure of the steel pipe for the retaining CIP wall
|
KR20160051521A
|
|
Sump installing structure with stress free
|
KR20160088059A
|
|
CFT pile Construction Method and the Shoring Method using the same file
|
KR20160042584A
|
|
CIP retaining wall with steel tube
|
KR101531206B1
|
|
Steel damper and reinforcemrnt method for earthquake-proof using the same
|
KR101577019B1
|
|
Diaphram and reinforcement structure of the concrete filled steel tublar comumn, and the manufacturing method of it
|
KR20150140006A
|
|
Sump for building
|
KR20150135937A
|
|
Top-down method for building undergroud structure using steel pipe
|
KR20150132965A
|
|
Connecting structure of the CFT column and the top-down underground construction method using the same
|
KR20150120779A
|
|
Bracket for the horizontal frame of a one-way steel structure
|
KR101557388B1
|
|
Rebar assembly unit for strengthening shearing force
|
KR20150029512A
|
|
The horizontal structural frame and the underground construction methods using it
|
KR20150073562A
|
|
Sump supported by a concrete foundation
|
KR101485563B1
|
|
The horizontal structural frame
|
KR101459036B1
|
|
H-steel girder for floor height curtailment and construction method using them
|
KR20140137665A
|
|
Enlarged capital of steel framed reinforced concrete column and method for construction of the enlarged capital
|
KR101433632B1
|
|
Top down method for Underground structure using the Concrete Bracket integrated Steel beam
|
KR101425030B1
|
|
Retaining wall with a lattice structure
|
KR101357280B1
|
|
Pc column for constructing multi story simultaneously and pc integrating method using this pc column
|
KR20140033889A
|
|
Holding apparatus for cft column, and the structure of the cft column, and the construction method ofthere
|