RU2006583C1
|
|
Process of construction of tunnels in soft water-saturated ground
|
SU1654465A1
|
|
Method of creating openings between tunnels of underground railway station
|
RU2018677C1
|
|
Powered shield complex for construction of tunnels with prefabricated embedded in rock lining
|
SU1546647A1
|
|
Tunnel prefabricated concrete lining
|
SU1675463A1
|
|
Device for erection of sleeperless railway track base
|
SU1571143A1
|
|
Method of erecting three-arch underground station
|
SU1560685A1
|
|
Method of erecting transition station of underground railway on constructing station and operating lines without stopping traffic
|
SU1448060A1
|
|
Method of constructing underground railway station of deep triple-vault type
|
SU1341317A1
|
|
Apparatus for constructing ballast-free track
|
SU1244334A1
|
|
Method of anchoring soil by freezing
|
SU1196455A1
|
|
Method of constructing junction of sinking section of underwater tunnel to section of small-depth tunnel
|
SU1175834A1
|
|
Mine car dumper
|
SU1164425A1
|
|
Method of constructing the station complex of deep underground railway
|
SU1252280A1
|
|
Skip-cage hoist
|
SU1158464A1
|
|
Rail vehicle tipper
|
SU1046426A1
|
|
Deep underground railway transfer station with single vault
|
SU1087670A1
|
|
Method of constructing change station of single-vault structure for underground electric railways
|
SU876831A1
|
|
Penetrometer
|