CN105297713A
|
|
Indiffusible pile foundation construction method
|
CN105019911A
|
|
Scraper of shield machine
|
CN104790962A
|
|
Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine
|
CN104695969A
|
|
Method for switching slurry tunneling mode to earth pressure tunneling mode of shield tunneling machine
|
CN104775826A
|
|
Continuous switching construction method of muddy water soil pressure double-mode type shield
|
CN104695967A
|
|
Ring frame beam device for shield launching and mounting method of ring frame beam device
|
CN104653191A
|
|
Method of earth pressure shield machine tunnelling in high efficiency in water-rich round gravel stratum
|
CN103769312A
|
|
Construction method for processing and recycling slurry shield muck
|
CN103628832A
|
|
Centralized mud treatment system for underground diaphragm wall construction and treating method thereof
|
CN103628500A
|
|
Grooving construction method for underground diaphragm wall in water-rich roundstone stratum
|
CN103628505A
|
|
Construction method for underground diaphragm wall connector detection
|
CN103615254A
|
|
Starting method for hinged shield construction machine on small radius curve
|
CN103244135A
|
|
Construction method for manufacturing mud film in high-permeability stratum
|
CN102691507A
|
|
Integrated fast construction method for shield machine
|
CN102767376A
|
|
Shield balanced launching and arriving construction method
|
CN102561331A
|
|
Drilling machine for pray stake construction and method for constructing by means of drilling machine
|
CN102400713A
|
|
Method for auxiliary construction of water falling in tunnel by communicated channel
|
CN102071953A
|
|
Method for casting surrounding concrete of lined steel pipe of shield tunnel
|
CN102022119A
|
|
Shield machine balance originating method
|
CN102022118A
|
|
Method for realizing balanced arrival of shield machine
|