CN110617073A
|
|
Construction method for air-propelled shield tunneling machine to integrally pass through curved air shaft
|
CN110702344A
|
|
Closed-loop bridge structure damage diagnosis method based on distributed strain measurement technology
|
CN110706213A
|
|
Bridge cluster structure damage judgment method based on strain response cumulative distribution function difference
|
CN110704911A
|
|
Bridge damage cross positioning method based on cluster structure similarity
|
CN110704801A
|
|
Bridge cluster structure operation safety intelligent monitoring and rapid detection complete technology
|
CN110284908A
|
|
A kind of circumferential grouting for water plugging method in shield received well
|
CN110303576A
|
|
A kind of grout filling plastic mould inlet for stom water
|
CN110258645A
|
|
Adjustable anti-settling inspection shaft adjusts ring and manhole cover combination structure
|
CN110056071A
|
|
A kind of municipal administration storm sewer assembling module and construction method
|
CN110030007A
|
|
Shield horizontal freezing receives construction method
|
CN110145317A
|
|
A kind of technique on shield machine's station-crossing construction method
|
CN109972659A
|
|
The novel municipal administration of one kind checks well construction and construction method
|
CN109898548A
|
|
Exempt from the assembling module and construction method of compacting in a kind of municipal pipeline basis
|
CN109706815A
|
|
A kind of roadnet with multilayer water purification structure
|
CN109680716A
|
|
A method of electric power pipe culvert is protected using top suspention plus lower support dual in situ
|
CN109853616A
|
|
A kind of underground space construction method crossing spring permeable areas stratum
|
CN109695192A
|
|
A kind of slabstone building block paving structure suitable for traffic loadings at different levels
|
CN109706853A
|
|
A kind of plugging plate and the construction method that slip casting in cored slab gastropore is carried out with it
|
CN109681213A
|
|
One kind inclined shaft end increase vertical shaft become a full member hole accelerate Impacts Evaluation of Urban Tunnel construction method
|
CN109653751A
|
|
A kind of use wears city expressway method for tunnel construction under yielding rubber ledge
|