Learn more

HILL ENGINEERING CO LTD

Overview
  • Total Patents
    21
About

HILL ENGINEERING CO LTD has a total of 21 patent applications. Its first patent ever was published in 2006. It filed its patents most often in Republic of Korea. Its main competitors in its focus markets civil engineering, measurement and telecommunications are LEE CHANG NAM, ROSSI DOMINIQUE and BARO CONSTRUCTION KEY.

Patent filings in countries

World map showing HILL ENGINEERING CO LTDs patent filings in countries
# Country Total Patents
#1 Republic of Korea 21

Patent filings per year

Chart showing HILL ENGINEERING CO LTDs patent filings per year from 1900 to 2020

Top inventors

# Name Total Patents
#1 Woo Jong Yeol 21
#2 Kim Dong Hae 9
#3 Hong Seong Wook 9
#4 Seo Young Chil 3
#5 Choi Ki Cheol 3
#6 Kim Jae Ung 3
#7 Bae Heung Han 3
#8 Lee Deok Geun 2
#9 Lee Young Jin 2
#10 Han Chae Hun 2

Latest patents

Publication Filing date Title
KR101358636B1 Foundation reinforcement construction method with guide tube
KR101253519B1 Method of aseismic reinforcement for existing building structure using pre cast concrete filled steel tube
KR20140014463A Installation structure for roof steel frame structure without purlin
KR20140007532A Shear reinforcement device for junctional region of column-slab
KR101311422B1 Connection structure of before and after pile connection for two rows pile construction
KR20130115578A Reinforcing method of economic steel column
KR101177316B1 Shear reinforcement device for junctional region of column-slab
KR101163038B1 Gutter installation structure for roof steel frame structure
KR101133577B1 Construction method for deck plate
KR101079751B1 Remote control system for measuring gradient of structure
KR101051356B1 Shear reinforcement device arranged in the slab-column connection
KR101036851B1 Manufacturing method of pre cast concrete filled steel tube and pre cast concrete filled steel tube using the smae
KR20120072984A Displacement measurement device of earth retaining temporary structure
KR101026112B1 The construction method of underground structure using mega-structure
KR101015092B1 Remote control system for measuring gradient of temporary earth retaining structure and installing method thereof
KR101051361B1 Steel beams having a compression stress member
KR100947061B1 Shear ladder reinforcement device of slab for mushroom construction
KR20110019627A Remote control system of structure
KR20090075458A Shear reinforcement device for junctional region of column-slab
KR20090063694A Shear reinforcement device for junctional region of column-slab