CN112100722A
|
|
Same-model multi-person cooperative operation method for BIM (building information modeling) pipe comprehensive design
|
CN112052497A
|
|
BIM-based pre-construction deep foundation pit simulation calculation method
|
CN111336215A
|
|
Steel wire rope self-locking fastener
|
CN110820942A
|
|
Construction method for roof overlong overhanging lotus flower modeling steel structure
|
CN110843079A
|
|
Method for controlling cracks of assembled building laminated slab
|
CN110905113A
|
|
Construction method of large-span concrete dome structure
|
CN110821198A
|
|
High-rise building external wall thermal insulation mortar falling prevention method
|
CN108412125A
|
|
A kind of strengthening concrete composite structure frame beam column construction
|
CN108343054A
|
|
Three axes agitating pile set beats construction reinforced concrete filling pile foundation pit enclosure construction
|
CN108385669A
|
|
A kind of CFG pile driving constructions engineering method
|
CN106677439A
|
|
Hidden button type super-long metal roof standing seam and construction method thereof
|
CN106836794A
|
|
A kind of construction method of concatermer sliding formwork
|
CN106592605A
|
|
Construction method of foundation pit bracing with tri-axial stirring piles overlapped with reinforced concrete cast-in-place piles to be driven
|
CN106677168A
|
|
Construction method of cast-in-place superfluid concrete pile
|
CN104712148A
|
|
Steel strand installation method for overall space corridor lifting construction
|
CN104631839A
|
|
Construction method for integrally lifting super-high, super-heavy, large-span space corridor
|
CN104060703A
|
|
Horizontal construction joint disposal method in tall building structural transfer floor
|
CN104060760A
|
|
Layered construction method for oversized concrete beam of structural transfer floor of high-rise building
|
CN104018701A
|
|
Method for controlling super-long reinforced concrete pool wall structure crack
|