AU2020104371A4
|
|
An Underwater Installation Method of Marine Rudder System
|
CN112177246A
|
|
Assembled outsourcing U-shaped steel sheet-concrete combination beam and coupling assembling
|
CN112227235A
|
|
Bridge is consolidated and is prevented roof beam body structure that falls
|
CN112252173A
|
|
Automatic deviation rectifying device for transverse creeping diseases of curved beam bridge body
|
CN112252154A
|
|
Novel anchor structure of short jib of half-through arch bridge
|
CN112265133A
|
|
Support leveling steel plate position adjusting device and method for manufacturing precast beam
|
CN112229590A
|
|
Adjustable roadbed damping ditch test device and damping effect test method thereof
|
CN112266624A
|
|
Method for improving pavement performance of asphalt and mixture by using oyster shell
|
CN112158238A
|
|
Automatic train driving curve generation method based on target and passenger flow difference
|
CN112096344A
|
|
Soluble bridge plug
|
CN112224244A
|
|
High-speed train automatic driving curve generation method based on temperature and load conditions
|
CN112224240A
|
|
High-speed train positioning system and positioning method
|
CN112231817A
|
|
Method and system for calculating equivalent thrust stiffness value of main cable to cable tower and longitudinal deviation of cable tower
|
CN112257182A
|
|
Magnetorheological suspension time-frequency characteristic multi-objective optimization method for whole vehicle vibration suppression
|
CN112281636A
|
|
Pier anti-collision system and method capable of automatically resetting
|
CN112095436A
|
|
High-efficiency fast-assembly pedestrian bridge
|
CN112255283A
|
|
Wave-electricity cooperative diagnosis method for earth-rock dam leakage
|
CN112198055A
|
|
Rock degradation testing device under dynamic water-stress coupling effect and testing method thereof
|
CN112249185A
|
|
Active claw structure for curved surface adsorption of foot type wall-climbing robot
|
CN112065415A
|
|
Test device and method for simulating stratum displacement caused by double-circular shield tunnel construction
|