EP3754133A1
|
|
Strip for a horizontal formwork system
|
EP3686375A1
|
|
Perimeter protection system for a horizontal formwork system, and method of assembly of a perimeter protection system
|
EP3587705A1
|
|
Vertical formwork
|
EP3385469A1
|
|
Anchor assembly for a vertical formwork and vertical formwork
|
EP3385470A1
|
|
Anchor for a vertical formwork and vertical formwork
|
EP3385468A1
|
|
Vertical formwork with a threaded anchor
|
EP3272967A1
|
|
Anchoring system for anchoring a climbing head
|
EP3258033A1
|
|
Anchor for a vertical formwork and vertical formwork
|
EP3258032A1
|
|
Anchor for a vertical formwork and vertical formwork
|
EP3241959A1
|
|
Climbing shoe for fixing a climbing scaffold to a concrete section of a building under construction
|
EP3231961A1
|
|
Horizontal formwork system and safety method for installing formwork panels in a a horizontal formwork system
|
EP3202998A1
|
|
Horizontal formwork
|
EP2871304A1
|
|
Self-climbing system for scaffold units in construction works of buildings
|
EP2789769A1
|
|
Repairing element adapted to be fixed to a housing of a formwork board, repairing method of a formwork board and repaired formwork board
|
ES2424774A1
|
|
Movable structure adapted to support a formwork of a new bridge section in cantilever
|
ES2397743A1
|
|
Structural element adapted to support a formwork
|
EP2518239A1
|
|
A climbing head for hoisting a self-climbing protection system for construction works in buildings
|
CA2734994A1
|
|
Perimetric protection system for buildings undergoing construction
|
EP2503077A1
|
|
Self-climbing perimetric protection system adaptable to buildings undergoing construction having a variable vertical projection
|
EP2261441A2
|
|
Collapsing device for a formwork table
|