CN111733822A
|
|
Drilling and grouting dual-purpose sleeve valve pipe, sleeve valve pipe construction structure and construction method
|
CN111734309A
|
|
Guiding device for construction of SMW method pile, and SMW method pile construction equipment and method
|
CN111719609A
|
|
Leaking stoppage device, leaking stoppage structure, leaking stoppage method and basement bottom plate pressure relief method
|
CN111058454A
|
|
Construction protection method on one side of existing building
|
CN111042218A
|
|
Method for detecting leakage of pile body
|
CN111042217A
|
|
Method for detecting leakage of pile body or underground continuous wall
|
CN111042147A
|
|
Screw-in type steel pile supporting method
|
CN110424393A
|
|
Discarded stake pull-up and its method
|
CN110485410A
|
|
Foundation pile pile making method
|
CN110258574A
|
|
Foundation ditch construction method
|
CN110158738A
|
|
Sponge city water storage system and its building technology
|
CN110042872A
|
|
Pressure-maintaining structure and its pressure maintaining method during middle-size and small-size basement construction
|
CN110043061A
|
|
It is existing build/structures on build the method for basement
|
CN109839095A
|
|
Self-balancing caisson (well) levelness measuring device and its method
|
CN109854168A
|
|
Middle-size and small-size basement special drilling machine
|
CN109914621A
|
|
The outer waterproof construction of basement and its laying method
|
CN109339128A
|
|
Prefabricated hollow shell pill method for correcting error
|
CN109506554A
|
|
Prefabricated hollow shell pill verticality measurement device and its measurement method
|
CN109208603A
|
|
Underground tension anchor pole sweep-out method
|
CN109113059A
|
|
Cast-in-situ bored pile breaks a processing method
|