Learn more

THIRD ENGINEERING CO LTD OF CCCC SECOND HIGHWAY ENGINEERING BUREAU

Overview
  • Total Patents
    16
  • GoodIP Patent Rank
    196,530
About

THIRD ENGINEERING CO LTD OF CCCC SECOND HIGHWAY ENGINEERING BUREAU has a total of 16 patent applications. Its first patent ever was published in 2009. It filed its patents most often in China. Its main competitors in its focus markets civil engineering and environmental technology are CHONGQING URBAN CONSTRUCTION HOLDING GROUP CO LTD, 2ND CONSTRUCTION CO LTD OF CTCE GROUP and SICHUAN PROVINCIAL TRANSP DEPARTMENT HIGHWAY PLANNING SURVEY DESIGN & RES INST.

Patent filings in countries

World map showing THIRD ENGINEERING CO LTD OF CCCC SECOND HIGHWAY ENGINEERING BUREAUs patent filings in countries
# Country Total Patents
#1 China 16

Patent filings per year

Chart showing THIRD ENGINEERING CO LTD OF CCCC SECOND HIGHWAY ENGINEERING BUREAUs patent filings per year from 1900 to 2020

Focus industries

Top inventors

# Name Total Patents
#1 Wang Bo 3
#2 Jiang Hailang 2
#3 Long Jia 2
#4 Yang Chunjie 2
#5 Li Hao 2
#6 Yongzhi Cheng 2
#7 Hao Li 2
#8 Zhang Yi 2
#9 Hu Xiujun 2
#10 Gong Zhaodong 2

Latest patents

Publication Filing date Title
CN105155383A Construction process of bubble light soil
CN104863030A Water meadow construction process in plateau alpine region roadbed construction
CN104964453A Bunker of mixing plant with fine heat-retaining property
CN104831638A Gantry crane for movable mold base and construction method thereof
CN104775831A Tunnel secondary lining inverted arch and arch wall combined part short-free side wall arcing construction method
CN103628389A Device for automatically adding and mixing TAF epoxy asphalt and mixing method
CN103603276A Steel corrugated pipe culvert construction method
CN102747690A Grouting construction method for vertical finish-rolling threaded steel U-shaped communicating tube
CN102678136A Dual-reduction turnover construction process for sprayed concrete
CN102650432A Desulfurization, dust-removal and residual-heat utilization technology for tail gas of coal-fired boiler of asphalt mixing plant
CN102635047A Large-span bridge deck composite structure layer construction technology
CN102605781A Rocky bed steel pipe pile sinking construction process
CN102619479A Underwater environment-friendly construction technology for large cast-in-situ bored pile
CN102191736A Rubber asphalt detritus under-sealed layer construction process
CN101691731A Construction technique of OGFC on airport expressway
CN101649121A Rubber asphalt proportioning method and rubber asphalt detritus under-sealed layer technique