Learn more

THE THIRD CONSTRUCTION CO LTD OF CHINA CONSTRUCTION FIFTH ENG BUREAU

Overview
  • Total Patents
    18
  • GoodIP Patent Rank
    91,444
  • Filing trend
    ⇩ 100.0%
About

THE THIRD CONSTRUCTION CO LTD OF CHINA CONSTRUCTION FIFTH ENG BUREAU has a total of 18 patent applications. It decreased the IP activity by 100.0%. Its first patent ever was published in 2016. It filed its patents most often in China. Its main competitors in its focus markets civil engineering, electrical machinery and energy and environmental technology are SHANGHAI CONSTRUCTION NO 2 GROUP CO LTD, CHINA RAILWAY NO 3 CONSTRUCTION AND INSTALLATION ENG CO LTD and CHINA CONSTR 1ST GROUP CONSTR & DEV CO LTD.

Patent filings in countries

World map showing THE THIRD CONSTRUCTION CO LTD OF CHINA CONSTRUCTION FIFTH ENG BUREAUs patent filings in countries
# Country Total Patents
#1 China 18

Patent filings per year

Chart showing THE THIRD CONSTRUCTION CO LTD OF CHINA CONSTRUCTION FIFTH ENG BUREAUs patent filings per year from 1900 to 2020

Top inventors

# Name Total Patents
#1 He Changjie 9
#2 Wu Zhi 7
#3 Jiang Lihong 4
#4 Chen Hao 3
#5 Huang Hu 3
#6 Tan Lixin 3
#7 Wen Lijun 3
#8 Zhao Jinguo 3
#9 Guo Pengxin 3
#10 Ning Zhiqiang 2

Latest patents

Publication Filing date Title
CN107135591A A kind of job site illumination intelligence control system based on GPRS
CN107090975A A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation
CN107130520A A kind of Bailey bracket double-layer double-direction arranges high-formwork construction method
CN107130521A A kind of dell precipice section large-section beam Bailey truss hoisting die construction method
CN106884476A A kind of ball node disc type bearing for rack lifting
CN106869169A A kind of three-dimensional interval construction method of underground pipe gallery warehouse
CN107060327A Detachable tripod post-cast strip independence support system and its application method
CN107059917A One kind splits element precast formula pipe gallery and its construction method
CN106641468A Pipeline firestops collar and mounting process thereof
CN106245674A Hollow wallboard mixes prefabricated assembled pipe gallery and construction method thereof
CN106088147A Wallboard mixes prefabricated assembled pipe gallery and construction method thereof on an empty stomach
CN106088620A Super thick EPS moulding fluting or the thinning construction technique in hole
CN106193567A Construction method is received in super-high buildings variable cross-section integrated form lifting operation platform
CN106192758A A kind of construction method utilizing the cantilever form large-scale high pier stud of construction
CN105970880A Expansion joint structure with several waterproof guards and construction method of expansion joint structure
CN106049501A Construction method for large-drop downward concrete transporting
CN105967075A Construction method of vertical transportation system at hundred-meter deep mining pit large-drop steep cliff
CN105735486A Super high-rise floor bearing plate rebar reserved embedded process