CN112287440A
|
|
Subway construction progress management system based on BIM and small-size unmanned vehicles
|
CN111441718A
|
|
Construction method, system and application for high-precision pilot shaft excavation of large-section steep slope long inclined shaft
|
CN111452183A
|
|
Prefabricated water collecting pit and construction method thereof
|
CN111456005A
|
|
Vibrating pile machine for pipe sinking gravel pile and pile forming method
|
CN111441343A
|
|
Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application
|
CN111456741A
|
|
Method for excavating dome of medium-sized cylindrical water diversion surge chamber
|
CN110847180A
|
|
Waterproof curtain grouting production sewage recycling control system and method
|
CN110835903A
|
|
Bottom arch concrete protection device and method for water delivery tunnel in shape of horseshoe
|
CN111088804A
|
|
Construction method of high-flow-state fine-aggregate concrete rock-fill dam in high-temperature area of equator
|
CN109748416A
|
|
A kind of grout curtain production waste recycling device and operating method
|
CN108868804A
|
|
Hob fixing device, hob measurement device and hobboing cutter replacing options
|
CN108917642A
|
|
Hob abrasion quantity measuring method and device
|
CN108625243A
|
|
Suitable for mountain area hills red clay area high-fill roadbed filling construction method
|
CN101929142A
|
|
Anti-seepage pressure reduction construction method of concrete dam body
|
CN101418563A
|
|
Installation method of long drilled shaft and major diameter penstock in hydraulic and hydroelectric engineering
|