CN112257608A
|
|
Yak breeding health state monitoring method
|
CN112132358A
|
|
Yak price prediction method based on PCA-DSCNN neural network
|
CN112184791A
|
|
Yak weight prediction method based on CNN-LSTM neural network
|
CN112183332A
|
|
Yak face identification method based on transfer learning
|
CN112182705A
|
|
BIM technology-based simulation model data analysis method
|
CN111950924A
|
|
Nuclear power plant progress calculation method based on intelligent algorithm
|
CN111950923A
|
|
Digital nuclear power plant maintenance guarantee and retirement management platform
|
CN110162763A
|
|
Magnanimity quality tests the optimization method for commenting form data intelligently to be configured and its system
|
CN110309987A
|
|
The Optimization Work method of magnanimity document piecemeal distribution editor's collaboration processing
|
CN109034551A
|
|
Equilibrium of stock method for construction plan establishment
|
CN108985605A
|
|
Progress management-control method for construction plan establishment
|
CN107885936A
|
|
The gravel embankment simulative optimization method of dam engineering dam facing
|
CN107885935A
|
|
Dam engineering arrangement and method for construction comprehensive optimization method based on BIM
|
CN107862138A
|
|
Dam engineering arrangement and method for construction feasibility and construction intensity matching optimization method
|
CN107729688A
|
|
Dam engineering digitization modeling optimization method
|
CN107219500A
|
|
Indoor rapid integrated localization method based on WIFI location fingerprint data
|
CN107194091A
|
|
Rock fill dam construction dividing elements method based on BIM technology
|
CN106454734A
|
|
Method for detecting safety state of builder
|
CN106547977A
|
|
A kind of IFC based on analytic hierarchy process (AHP) and the one-to-one Semantic mapping methods of CityGML
|
CN106528760A
|
|
IFC-standard-based analysis model working method applied to engineering project
|