CN112160743A
|
|
Method for detecting perpendicularity of drilled hole and method for detecting perpendicularity of pile body
|
CN111851484A
|
|
Method for cutting off semi-invasive prestressed anchor cable in supporting pile by rotary drilling rig
|
CN111851509A
|
|
Temporary channel construction method based on deep foundation pit inner support structure
|
CN111851478A
|
|
Pile-forming construction method for light corrugated steel pile casing isolation non-filling karst cave filling pile
|
CN111852326A
|
|
Karst development area rotary excavating mine type extrusion drill bit karst cave treatment method
|
CN111608587A
|
|
Hard rock drilling construction system and method for foundation pit secant pile in height-limited area
|
CN111663522A
|
|
Comprehensive construction method for interlocking of deep stone-filling layer water-stop curtain down-the-hole hammer and pipe
|
CN111520604A
|
|
Automatic siphon lubricating device
|
CN111502757A
|
|
Air-raid shelter tunnel block structure
|
CN111608459A
|
|
Construction method of underground diaphragm wall in underground air-raid shelter area
|
CN111424684A
|
|
Rotary pulling wedge type self-unlocking anchor cable
|
CN111424683A
|
|
Rotary pulling clamping piece type self-unlocking anchor cable
|
CN111517543A
|
|
Sewage treatment plant for green building
|
CN111424674A
|
|
Foundation pit reverse construction method steel pipe structure column butt joint platform and butt joint method
|
CN111549846A
|
|
Construction method for foundation pit earthwork transportation and crushing treatment
|
CN111410337A
|
|
One-stop treatment system and method for foundation pit soil
|
CN111519637A
|
|
Grooving comprehensive construction method for pipeline underground diaphragm wall
|
CN111452477A
|
|
Environment-friendly building integrated wallboard processing device and using method
|
CN111411624A
|
|
Hoisting method for reinforcement cage of underground continuous wall in height-limited area
|
CN111335838A
|
|
Salvaging method for down-the-hole hammer drilling tool
|