CN111140205A
|
|
Method for preventing coal bed gas pre-pumping well from being damaged along with recovery
|
CN111021959A
|
|
Well drilling method for preventing water accumulation in goaf
|
CN110965965A
|
|
Method for developing underlying coal reservoir by utilizing coalbed methane depletion well
|
CN111075419A
|
|
Squeezing permeability-increasing blockage removing process for low-yield coal bed gas vertical well
|
CN110863801A
|
|
Method for changing coalbed methane pre-pumping well into mining well
|
CN110566191A
|
|
Method for detecting casing loss in coal-bed gas well
|
CN110173236A
|
|
A kind of goaf coal bed gas well pumping method
|
CN104863562A
|
|
Broken and soft low-permeability coal bed horizontal well staged fracturing technology
|
CN104863537A
|
|
Intermediate casing recovering and connecting device passing through mined-out region and recovery process
|
CN104895531A
|
|
Single thick coal seam ground mining well extraction process
|
CN104963714A
|
|
Standing air shaft safe coal-uncovering technology of high gassy mine
|
CN104832089A
|
|
Efficient coal dust flow-back process for use in radial well construction
|
CN104929567A
|
|
Low-cost construction process for passing through goaf
|
CN104863508A
|
|
Lower-pressure jetting reversed-drawing pore-forming technology in radial direction well construction
|
CN104481468A
|
|
Coal bed gas well open hole well completion technology
|
CN104141467A
|
|
Tool special for fishing combination operation on tail pipe in coal-bed gas well and operation process by using tool
|
CN104234682A
|
|
Coiled tubing separate-layer fracturing method suitable for multiple thin coal seams
|
CN104005766A
|
|
Chemical method for weakening of top coal
|