CN104989443A
|
|
Device and method for quick dust falling during tunnel detonating
|
CN104318408A
|
|
Multi-target and multi-dimension risk management system for large building engineering construction
|
CN104268807A
|
|
Carbon emission calculation method based on entire life cycle of building
|
CN104236430A
|
|
Shield tunnel section curvature radius testing device and application method thereof
|
CN104110046A
|
|
Entering-rock cast-in-place pile sediment thickness measuring device and utilizing method thereof
|
CN104091215A
|
|
Project planning management system based on building information model
|
CN103984995A
|
|
Judgment method of deep foundation pit engineering risk early-warning index based on benefit-danger balance point
|
CN103971288A
|
|
Steel structure construction risk assessment method based on accident case-based reasoning
|
CN103942739A
|
|
Method for construction of construction project risk knowledge base
|
CN103577975A
|
|
Remote office system based on mobile communication network and control method of the remote office system
|
CN103573269A
|
|
Shield tunnel grouting layer performance detection method
|
CN103469801A
|
|
Method for constructing foundation pit enclosure structure on basis of prefabricated ground walls
|
CN103279846A
|
|
Project acceptance method and system based on BIM model
|
CN103225510A
|
|
Construction method of tunnel construction risk map for TBM (tunnel boring machine)
|
CN102521710A
|
|
Building construction quality safety online risk assessment system
|
CN102521709A
|
|
Building construction quality safety online risk management system
|