Learn more

RUIZHOU CONSTRUCTION GROUP CO LTD

Overview
  • Total Patents
    13
  • GoodIP Patent Rank
    132,075
About

RUIZHOU CONSTRUCTION GROUP CO LTD has a total of 13 patent applications. Its first patent ever was published in 2019. It filed its patents most often in China. Its main competitors in its focus markets civil engineering, macromolecular chemistry and polymers and materials and metallurgy are HYUNDAI C & M CO LTD, BEIJING SIFANGRUGANG CONCRETE PRODUCT CO LTD and DAESANG E&C.

Patent filings in countries

World map showing RUIZHOU CONSTRUCTION GROUP CO LTDs patent filings in countries
# Country Total Patents
#1 China 13

Patent filings per year

Chart showing RUIZHOU CONSTRUCTION GROUP CO LTDs patent filings per year from 1900 to 2020

Top inventors

# Name Total Patents
#1 Jin Mingchun 11
#2 Wang Qinghao 11
#3 Mei Chunyan 11
#4 Ma Yuxia 11
#5 Gong Sunwu 11
#6 Wang Baijun 10
#7 Liang Xiaojun 5
#8 Zhang Liwang 3
#9 Niu Junping 2
#10 Xia Tailong 1

Latest patents

Publication Filing date Title
CN112049278A Waterproof building external wall heat insulation structure and construction method thereof
CN112012240A Waterproof basement bottom plate that row combination is prevented to cavity
CN112012247A Basement post-cast strip anti-seepage construction method
CN111963780A Construction process for wall-through waterproofing of hot water pipeline
CN112012418A Construction method for laying indoor stone materials capable of preventing hollowing
CN112001638A Building site management system based on internet of things
CN112003938A Municipal works job site remote management system
CN111943600A Town road pervious concrete and construction method thereof
CN111943601A Building engineering external wall heat insulation material and preparation method thereof
CN111978039A Construction method for integrally cast building house
CN111734028A Assembly connection method for assembly type concrete frame structure
CN111255237A Construction method for controlling overall position of column reinforcement
CN110424428A The construction method of the comprehensive Yield rainfall relation system of deep basal pit