CN111980427A
|
|
Automatic wall building equipment for construction site
|
CN111997371A
|
|
A portable wall body construction device for building site
|
CN111962829A
|
|
Intelligent putty knife coating equipment for building construction
|
CN111705807A
|
|
Dust settling system for excavation construction of urban long and narrow type support-free deep foundation pit
|
CN111572503A
|
|
Full-automatic cleaning system for engineering vehicle in building construction site
|
CN110280692A
|
|
A kind of intelligent reinforcing bar coalignment of construction
|
CN110485737A
|
|
A kind of Elements of Space Grid Truss location and installation construction method based on BIM technology
|
CN110485652A
|
|
FRP plane skylight automatic smoke removing skylight construction technology for large public building
|
CN110552481A
|
|
Construction method of wear-resistant and anti-skid integrally suspended assembled damping sports floor
|
CN110552440A
|
|
safe and environment-friendly construction process for high-strength assembled integral type sandwich heat-insulation shear wall
|
CN110433906A
|
|
A kind of building waste fast-crushing device
|
CN110593542A
|
|
Support for building engineering
|
CN110316234A
|
|
A kind of receipts sand device for construction site
|
CN109944430A
|
|
A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation
|
CN109944399A
|
|
A kind of house roof Waterproof Construction Technique based on waterproof roll
|
CN109812034A
|
|
A kind of cooling for large volume casting concrete structural body, moisture retention construction method
|
CN109811969A
|
|
A kind of building body top of the slope structurally waterproof heat insulation house surface surface layer anti-crack construction technique
|
CN109184213A
|
|
Steel grid construction technique based on BIM setting-out and 3-D scanning
|
CN109208821A
|
|
A kind of built-in steel pipe Constructional Col-umn Construction method of ALC building block
|
CN109452064A
|
|
A kind of massif rock slope lattice girder vertical greening construction method
|