RU2745090C2
|
|
Cross member (versions) and method of its attachment to single-column support of power transmission lines (versions)
|
RU2708745C1
|
|
Development method of low-permeability oil formation section
|
RU2713023C1
|
|
Method of bitumen deposit development with horizontal wells with distributed perforation
|
RU2713058C1
|
|
Method for development of non-uniform section of ultraviolet oil deposit
|
RU2704685C1
|
|
Downhole water pumping method for oil formation flooding purposes
|
RU2708746C1
|
|
Method for proppant multistage hydraulic fracturing of oil formation
|
RU2713270C1
|
|
Operation method of horizontal well
|
RU2713026C1
|
|
Development method of low-permeable reservoir of oil deposit
|
RU2713017C1
|
|
Method of preventing sand transfer to well
|
RU2709260C1
|
|
Method of improving development efficiency of low-permeability oil deposits
|
RU2713014C1
|
|
Development method of ultraviscous oil deposit by wells with "smart" perforation
|
RU2713047C1
|
|
Method for proppant hydraulic fracturing of oil formation
|
RU2704688C1
|
|
Method for development of structural oil deposit
|
RU2716674C1
|
|
Mobile well servicing unit
|
RU2695906C1
|
|
Method for development of weakly permeable oil deposit with application of horizontal wells and water and gas impact
|
RU2731243C2
|
|
Method of developing low-permeable oil deposit using separate injection of water and gas
|
RU2678337C1
|
|
Multi-layer deposits with hard-to-recover oil reserves development method by the compacting grid method
|
RU2701001C2
|
|
Methods of pressure testing of tubing string in well, manufacturing of shut-off pressure testing device and device for implementation of methods
|
RU2700425C2
|
|
Device for pressure testing of pipe string in well
|
RU2677768C1
|
|
Method of operation of a well, complicated by carrying out of mechanical impurities
|