Learn more

PUBLIC JOINT STOCK COMPANY TRANSNEFT

Overview
  • Total Patents
    26
  • GoodIP Patent Rank
    62,205
About

PUBLIC JOINT STOCK COMPANY TRANSNEFT has a total of 26 patent applications. Its first patent ever was published in 2014. It filed its patents most often in Canada, EPO (European Patent Office) and EAPO (Eurasian Patent Organization). Its main competitors in its focus markets mechanical elements, civil engineering and measurement are PUBLIC JOINT STOCK COMPANY “TRANSNEFT”, DUNA TISZA KOEZI ALLAMI EPITOE and SOUTH ENGINEERING DETECTION RESTORATION TECH RESEARCH INSTITUTE.

Patent filings in countries

World map showing PUBLIC JOINT STOCK COMPANY TRANSNEFTs patent filings in countries

Patent filings per year

Chart showing PUBLIC JOINT STOCK COMPANY TRANSNEFTs patent filings per year from 1900 to 2020

Top inventors

# Name Total Patents
#1 Surikov Vitaly Ivanovich 13
#2 Shoter Pavel Ivanovich 9
#3 Lisin Yury Viktorovich 8
#4 Mikheev Yurii Borisovich 6
#5 Miroshnik Aleksandr Dmitrievich 6
#6 Revel-Muroz Pavel Aleksandrovich 6
#7 Pavlov Vyacheslav Vladimirovich 5
#8 Bondarenko Valeriy Vyacheslavovich 5
#9 Sapsay Alexey Nikolaevich 5
#10 Fridlyand Inna Yakovlevna 4

Latest patents

Publication Filing date Title
MX2016014553A Transverse-magnetization magnetic system for intra-pipe defectoscope.
EA029805B1 Ultrasonic defectoscope sensor carrier
EA031338B1 Magnetic measuring system for a flaw detector having longitudinal magnetization
CA2942784A1 Method of thermallly insulating stop valves, and thermal-insulation device
CA2942824A1 Movable pipeline-support and support assembly thereof
CA2942855A1 Method for installing a stationary support in a planned position
EP3124841A1 Method for monitoring the position of above-ground pipelines in permafrost conditions
CA2942834A1 Device for heat stabilization of perennial permafrost soils
CA2942790A1 Pile foundations for supporting power transmission towers
CA2942828A1 Stationary pipeline support
CA2942805A1 Method for thermally insulating reservoirs
CA2942788A1 Method for installing overhead transmission line supports on permafrost soils