CN112267863A
|
|
Temporary plugging and re-fracturing method for coal-bed gas well cracks
|
CN112250369A
|
|
Crack plugging consolidation agent, preparation method and crack plugging method
|
CN112267867A
|
|
Deep coal bed gas well volume acidizing fracturing method
|
CN112210362A
|
|
Solid gel breaker, preparation method and method for delaying gel breaking time
|
CN111339481A
|
|
Well testing analysis method for coal-bed gas well
|
CN111305794A
|
|
Method for keeping high permeability of coal rock
|
CN111396020A
|
|
Evaluation method for interference between coal-bed gas wells
|
CN111415031A
|
|
Method for predicting productivity of coal-bed gas well
|
CN111042782A
|
|
Method for recovering production of coal bed gas well
|
CN110984972A
|
|
Method for calculating gas-water permeability of coal bed gas in different production stages
|
CN110805438A
|
|
Method for determining critical desorption pressure of coal bed gas
|
CN110685645A
|
|
Two-stage jet drainage device and method for coal-bed gas well mouth
|
CN110388226A
|
|
A kind of coal bed gas well negative pressure mining control device and system
|
CN110054440A
|
|
A kind of coal bed gas well cementation low-temperature high-early strength low weight cement slurry
|
CN109652052A
|
|
A kind of preparation method of fracturing fluid, gel breaker, fracturing fluid system and fracturing fluid
|
CN109575891A
|
|
A kind of leak stopping slurry and preparation method thereof
|
CN109209349A
|
|
A kind of CBM Fracturing horizontal well multiple spot monitoring system
|
CN108533241A
|
|
A kind of CBM Fracturing method
|
CN108276981A
|
|
A kind of fracturing liquid rubber-breaking accelerating agent, fracturing fluid system and their preparation method
|
CN107313721A
|
|
Pumpingh well impressed current method anti-corrosive apparatus
|