CN112160605A
|
|
A scale for concrete thickness, elevation and roughness control
|
CN111997685A
|
|
Construction method for highway to penetrate through coal seam goaf section
|
CN111979863A
|
|
Construction method for filling high embankment by using foam lightweight concrete adjacent to high-speed rail
|
CN111706074A
|
|
Adjustable shaping template of prefabricated plate at variable-section column and manufacturing method thereof
|
CN110210762A
|
|
A kind of employee performance dynamic wire examination method based on big data analysis
|
CN110130154A
|
|
High-speed railway treatment of soft foundation screw rod pile construction method
|
CN110106876A
|
|
A kind of diplopore grouting construction method
|
CN110106877A
|
|
A kind of single hole grouting construction method
|
CN110016917A
|
|
A kind of slip casting sealing-plug and its grouting system
|
CN110005443A
|
|
The construction method of set lining is added in a kind of Business Line tunnel
|
CN110002823A
|
|
A kind of tunnel high strength spray concrete
|
CN110030972A
|
|
Tunnel Overbreak & Underbreak detection method based on ExcelVBA
|
CN109854254A
|
|
A kind of neighbouring high-speed rail two-wire large cross-section tunnel cantilever excavator construction technology
|
CN108316285A
|
|
Operating platform and construction method suitable for the construction of deep hole large diameter hole pile cages
|
CN108301847A
|
|
A kind of Tunnel Second Lining trolley hydraulic end head mould and its construction method
|
CN107988919A
|
|
A kind of and the pinner and pre-embedded bolt hole forming equipment of bridge pier cap synchronous construction
|
CN105421255A
|
|
Simple device and method for dismounting Bailey beam support
|