Particle arrangement, particularly for sand dowel elements, consists of solid particles and carrier, where particles are directly connected with carrier, and sliding layer is additionally arranged on arrangement
DE102006055307A1
Cross-beams fixing method for railways, involves arranging anchor block that form-fits with recesses in beam sides and force-fits with underground, in recesses, where block is made by lining and sealing of hollow form with membrane
EP1686271A1
Sand dowel
DE102005003997B3
Sand dowel, as an anchor for a screw within a drilling in solid materials, has an inner sliding layer to reduce friction between the screw and the dowel sand and act as a screw bond
DE102004037170A1
Method for producing a railway track
DE10245350A1
Cylindrical shell
DE10209873A1
Material transmitting pressures and shear forces in building structures comprises pressure-hardened agglomerate of granular material and compressible binder
DE10045928A1
Assembly to mix a fluid with solid materials, directs the solid matter to one side for the fluid stream to strike it at a collision angle for the fluid droplets to penetrate through the solids to give a homogenous mixture
DE19851354A1
Tool for drilling in loose rock is arranged on cutting wheels of tunnel boring apparatus, bore crowns of earth drilling apparatus or comparable tool holders or is integral component part of them