Learn more

KOBEC CO LTD

Overview
  • Total Patents
    25
  • GoodIP Patent Rank
    193,990
About

KOBEC CO LTD has a total of 25 patent applications. Its first patent ever was published in 2000. It filed its patents most often in Republic of Korea. Its main competitors in its focus markets civil engineering, packaging and shipping and transport are SHIM KYU SOOK, O K CONSULTANT CO LTD and CHA HYUN NAM.

Patent filings in countries

World map showing KOBEC CO LTDs patent filings in countries
# Country Total Patents
#1 Republic of Korea 25

Patent filings per year

Chart showing KOBEC CO LTDs patent filings per year from 1900 to 2020

Top inventors

# Name Total Patents
#1 Kiem Jeong Hyun 11
#2 Kim Jeong Hyeon 9
#3 Kim Jung Hyun 4
#4 You Kwang Soo 3
#5 Noda Shigehide 2
#6 Shin Jae Woo 1
#7 Kim Dong Wook 1
#8 Yun Cheong No 1
#9 Yasuhisa Hishijima 1
#10 Shim Chang Su 1

Latest patents

Publication Filing date Title
KR102096004B1 Built-up railway bridge with eccentric bending web
KR102091357B1 Trolley for moving a heavy constructions and Trolly train
KR101963536B1 Bridge lifting and rotating device
KR101572563B1 Method for carrying out replacement of an upperstructure of a bridge
KR101562798B1 Truss structure with a reinforced beam
KR101269868B1 A method for bridge improving
KR20130040409A System and method for launching upper structure of bridege
KR20110083203A Repairing and reinfocing method of pier and abutment
KR20110083204A Repairing and reinfocing method of structure approaches
KR100877662B1 Construction method of riding over horizontal obstracles by using a moving car
KR100867238B1 Separation of top and bottom possible electric moving car
KR100825373B1 Superstructure for bridge and the construction method thereof
KR100825444B1 Steel and reinforced concreate through bridge with a sloped main girder and construction method thereof
KR100610586B1 The bridge bearing system
KR100571525B1 Expansion method of a bridge using concrete structure
KR20050108867A A method for changing plate-girder bridge of railway bridge into slab bridge by using temporary construction bents.
KR20020082728A Process and frame for substituting steel girder of a railway bridge for concrete slab
KR20020005175A Method for reinforcing resistance force of a bridge using a prefabricated bracket
KR20020066824A Top structure for bridging.
KR20020066133A Position moving control system of large construct