Drilling device for subsoil improvement by columns in soil
DE102005001227A1
Method for improving a foundation in the ground comprises inserting columns having a lower bound section made from mortar or cement and an upper bound section made from ballast
DE102004038896A1
Base plate pre-arrangement method, involves passing base plate through drill hole having smaller diameter, where deep floor plastering with larger diameter takes place under base plate
DE10346890A1
Method and arrangement for the continuous detection of settlements on structures by means of a hydrostatic tube balance measuring system
EP1457188A1
Method for accelerating the decomposition of corpses
DE10338171A1
Method for introducing a slender base pile and ground pile produced by this method
DE10333613A1
Improvement of a soft layer
DE10313912A1
Device for determining the diameter or radius of cavities
DE10232174A1
Injection device for introducing injection media into a floor
DE10146342A1
Method for determining the storage density
DE10145288A1
Method for producing stuffing columns
DE10133121A1
Soil compaction method
DE10133122A1
Process for the manufacture of darning pillars for soil improvement
DE10131973A1
Procedure for taking sample cores
DE10113804A1
Device for measuring the radius or diameter of cavities
DE10108602A1
Method of making columns
DE10064187C1
Diameter measuring device for ground foundation or wall element has measuring element provided by rod-shaped profile with 2 concave strips pressed together for switching from flexible state to rigid state
DE19960023A1
Active foundation
DE19960036C1
Method of measuring a borehole
DE19949393C1
Support or wall in a borehole is formed by a jet at the drill rod which sprays a mixture of loose soil and concrete with a lower coil spring to monitor the edge of the mixture for a controlled wall thickness