Learn more

HARBIN LOGSTOR ENERGY SAVING TECHNOLOGY CO LTD

Overview
  • Total Patents
    62
  • GoodIP Patent Rank
    28,232
About

HARBIN LOGSTOR ENERGY SAVING TECHNOLOGY CO LTD has a total of 62 patent applications. Its first patent ever was published in 2013. It filed its patents most often in China. Its main competitors in its focus markets mechanical elements, machines and packaging and shipping are SHANGHAI KEHUA THERMAL PIPE SYSTEM CO LTD, AEROSUN TOLA EXPANSION JOINT CO LTD and IMI ENOTS LTD.

Patent filings in countries

World map showing HARBIN LOGSTOR ENERGY SAVING TECHNOLOGY CO LTDs patent filings in countries
# Country Total Patents
#1 China 62

Patent filings per year

Chart showing HARBIN LOGSTOR ENERGY SAVING TECHNOLOGY CO LTDs patent filings per year from 1900 to 2020

Top inventors

# Name Total Patents
#1 Lai Zhencheng 62
#2 Zhang Jushan 62
#3 Wang Hui 31
#4 Zhuang Xuwen 27
#5 Liu Zhongbin 3
#6 Liu Feng 1

Latest patents

Publication Filing date Title
CN104358934A Polyethylene (PE) double-tube heat insulating tube crossing tee joint alarm line fixing device and fixing method
CN104358933A Fixing device and fixing method for intelligent prefabricated directly buried double-barreled thermal insulation tube alarm line
CN104455939A Device and method for fixing alarm lines to crosslinked polyethylene thermal-insulating pipe crossing tee joint
CN104373743A Plate type hot melting welding coated joint plug for prefabricated directly-buried insulating pipeline system and plugging method
CN104653932A Intelligent prefabrication direct burial crosslinked polyethylene thermal insulation pipe double-barreled elbow alarm line fixing method
CN104373819A Monitoring device and method for alarm cable of prefabricated directly-buried insulating pipe
CN104482358A Intelligent thermal insulation steel pipe double-barreled reducing tee pipeline alarm line fixing device and fixing method
CN104373680A Joint coating support for prefabricated directly-buried insulating pipeline system and installing method
CN104373730A Fixing device and method for intelligent prefabricated directly-buried thermal insulation pipe double pipe elbow alarm lines
CN104373685A Intelligent prefabricated directly-buried insulating pipe steel pipe double-pipe crossing tee joint and fixing method for alarm cables
CN104368944A Joint coating plate fusion welding high-pressure clamp for prefabricated directly-buried insulating pipeline system and clamping method
CN104390099A Intelligent prefabricated directly-buried heat-preserving pipe cross-linked PE (Poly Ethylene) working double pipe and fabricating method
CN104373699A Intelligent prefabricated directly-buried thermal insulation pipe crosslinked polyethylene working pipe and manufacturing method
CN104373773A Method for fixing alarm lines of intelligent prefabricated directly-buried crosslinked polyethylene thermal insulation pipe fitting elbow
CN104390103A Telescopic connector repairing sleeve of prefabricated direct-embedded heat preservation pipeline system and connecting method
CN104373772A Hot melting buried wire joint coating plate device for prefabricated directly-buried insulating pipeline and manufacturing method
CN104373688A Double working steel pipes of prefabricated directly-buried insulating pipe and manufacturing method
CN104373731A On-site connector joint coating insulating foaming bag and foaming method for prefabricated directly-buried insulating pipe system
CN104369996A Transporting bolster device in transportation of prefabricated directly-buried insulating pipes and using method
CN104373687A Crosslinked polyethylene double-pipe parallel tee joint of intelligent insulating pipe and fixing method for alarm cables of tee joint