Learn more

GUIZHOU QIANYUAN POWER CO LTD

Overview
  • Total Patents
    27
  • GoodIP Patent Rank
    60,472
  • Filing trend
    ⇩ 91.0%
About

GUIZHOU QIANYUAN POWER CO LTD has a total of 27 patent applications. It decreased the IP activity by 91.0%. Its first patent ever was published in 2017. It filed its patents most often in China. Its main competitors in its focus markets environmental technology, it methods for management and computer technology are GUANGDONG XINTONG COMMUNICATION CO LTD, SHENZHEN VZOOM CREDIT INFORMATION SERVICE CO LTD and FUTURE SYSTEM CONSULTING CORP.

Patent filings in countries

World map showing GUIZHOU QIANYUAN POWER CO LTDs patent filings in countries
# Country Total Patents
#1 China 27

Patent filings per year

Chart showing GUIZHOU QIANYUAN POWER CO LTDs patent filings per year from 1900 to 2020

Top inventors

# Name Total Patents
#1 Li Zehong 24
#2 Xiao Peng 14
#3 Song Wanli 13
#4 Wu Zhi 12
#5 Cu Yuanke 12
#6 Xia Anyu 12
#7 Wu Yongqi 11
#8 Cao Xianfeng 9
#9 Yu Ling 9
#10 Zhang Chao 8

Latest patents

Publication Filing date Title
CN111913239A Method and system for calculating rainfall of effective surface of reservoir based on meteorological hydrological observation data
CN112070286A Rainfall forecast early warning system for complex terrain watershed
CN112019523A Network auditing method and device for industrial control system
CN111931178A Host protection method and system based on white list and file feature code in industrial environment
CN111476474A Scheduling method for reducing water abandonment amount of cascade hydropower station
CN111476475A Short-term optimized scheduling method for stepped hydropower station under multi-constraint condition
CN111476477A Power generation benefit target-based medium and long term optimization scheduling method for cascade hydropower station
CN110851989A Visual deduction method of flood control plan
CN110806174A Dynamic visual monitoring method for flood discharge gate
CN110736518A Dam water level visual monitoring system
CN110472824A A kind of short-term Multiobjective Optimal Operation method of step power station considering peak regulation demand
CN110472825A A kind of step power station Real-Time Scheduling abandoning water cutting method that multi-stage scheduling mechanism is coordinated
CN109815611A A kind of Basin Boundary generation method based on Digital Valley
CN109783716A A kind of power supply and demand data automatically extract and processing system and method
CN109543887A A kind of Water level trend control method of daily regulation reservoir different times
CN106878466A A kind of Hydropower Unit data management and equipment control unified platform
CN106851214A A kind of industrial television central monitoring system and networked platforms
CN107018012A A kind of step hydropower station industrial television centralized watch main station system
CN107065824A A kind of Hydropower Unit remote fault diagnosis open platform
CN107015553A A kind of Hydropower Unit remote control platform status definition and logic computing method