RU2715008C1
|
|
Method of development and operation of wells with use of dissolved gas and installation of installation for implementation thereof
|
RU2672365C1
|
|
Method for developing oil deposit on unsteady cyclic pumping mode and device for its implementation
|
RU2605571C1
|
|
Garipov method for intensification of oil extraction and apparatus therefor
|
RU2584991C1
|
|
Plant with mechanical garipov valve for simultaneous separate operation of submersible pump and operating method thereof
|
RU2561133C1
|
|
Garipov(s hydraulic regulator and method of its use
|
RU2521872C1
|
|
Garipov hydraulic control
|
RU2534688C2
|
|
Installation named after garipov for oil production with dual disposal of brine water and method of its implementation (versions)
|
RU2529072C2
|
|
Method of influence on stagnant zone of intervals of strata of garipov and plant for its implementation
|
RU2498053C1
|
|
Garipov method of simultaneous separate production of hydrocarbons and equipment for its implementation
|
WO2013141735A1
|
|
Oil well unit (alternatives)
|
RU2506416C1
|
|
Downhole pump unit
|
RU2474673C1
|
|
Garipov hydraulic control
|
RU2500879C2
|
|
Garipov packer with electronic instrument (versions) and method of its implementation
|
RU2439374C1
|
|
Garipov well pump packer installation
|
RU2425955C1
|
|
Garipov hydraulic reusable packer, installation and method for its implementation
|
RU2414584C1
|
|
Procedure for preparing well pump equipment by garipov to operation
|
RU2438043C2
|
|
Garipov pump unit for simultaneous separate operation of wells (versions)
|
RU2394978C1
|
|
Procedure for completion and operation of well
|
RU2405918C1
|
|
Method of garipov for oil production and device for its realisation
|
RU2409740C2
|
|
Device for analysis and control over wells operation
|