Process for constructing a dam or dyke structure and structure obtainedusing this process
BR8807693A
Process to control the movements of a filling material
EP0379508A1
Method and arrangement for influencing the interaction between a layer of earth and a structure situated in association with the layer of earth.
ZA8705339B
14,17beta-ethano-14beta-estratrienes and estratetrimprovements in or relating to method of anchoringaenes,processes for their production,and pharmaceu a prefabricated pile into the ground and pile fortical preparations containing them carrying out the method
FR2601707A1
Method for anchoring a prefabricated pile in the ground and pile for carrying out this method
FR2601706A1
Method for anchoring a foundation pile in the ground and device for carrying out said method
FR2592414A1
Method and device for driving a driving tube in order to form a pile
FR2591247A1
Method and machine for installing one or more large screen-forming elements into the ground
ZA8509328B
Arrangement in vibration isolation or vibration damping
EP0184570A2
Method and apparatus for producing a concrete or similar pile in the ground by using a tube of flexible material shielded by a protecting device, preferably a mandrel
EP0203956A1
Method and apparatus for affecting or changing the liquid content in a soil stratum
EP0203137A1
Method and apparatus for compacting a soil stratum using vibrations.
US4685835A
Method of increasing the compressibility of liquid-saturated material
FI853860A0
Device for vibration insulation and / or heat insulation
CA1240344A
Arrangement for energy isulation or vibration isolation
NL8500630A
Concrete-filled foundation pile - has junction points in longitudinal slots in tube limiting distortion if tongues between them
FR2576049A1
Process for producing a concrete pile or the like using a lacing tube comprising fins and lacing tube for implementing it
BE901163A
Procedure for forming concrete pile - involves driving of tube and flexible envelope into ground with subsequent two-stage drive tube extraction