Learn more

CM PARTNERS

Overview
  • Total Patents
    25
About

CM PARTNERS has a total of 25 patent applications. Its first patent ever was published in 2006. It filed its patents most often in Republic of Korea. Its main competitors in its focus markets civil engineering are ARMOUR WALL GROUP PTY LTD, HANBIT STRUCTUAL ENGINEERING CO and ILE DES BREVETS HENRI VIDAL SO.

Patent filings in countries

World map showing CM PARTNERSs patent filings in countries
# Country Total Patents
#1 Republic of Korea 25

Patent filings per year

Chart showing CM PARTNERSs patent filings per year from 1900 to 2020

Focus industries

# Industry
#1 Civil engineering

Top inventors

# Name Total Patents
#1 Seo Jung Ho 22
#2 Yoo Kwang Jun 5
#3 Liu Won Sock 2
#4 Yom Kyong Soo 2
#5 Kim Sang Gon 1
#6 Gho Su Jin 1
#7 Shin Dong Kyu 1
#8 Lee Houng Jae 1
#9 Song Jeong Geun 1
#10 Lee Kyoung Yun 1

Latest patents

Publication Filing date Title
KR101034853B1 Top-down construction method by whole support of retaining wall and form corresponding to uneven surface for using in the same
KR20120093699A Using the reinforced mold encase steel beams and its construction method
KR20120088947A The earth retaining wall construction method which uses H-Pile where attaches the parapin and H-Pile drawing method
KR101035404B1 Slurry wall and slab junction structure and its using top-down construction method
KR20120039439A Synthetic pile wall using the h-steel and its construction method
KR20120052436A Structures and production methods column mesh of slurry wall and construction method using a column mesh of slurry wall
KR20120040780A Structural joint system for temporary cip retaining wall used a part of underground outer composite wall
KR20120035319A Composite basement wall structual plan which uses temporary earth wall with underground construction outer wall parts and construction method
KR20120025945A Reinforcement assembly of concrete file and building foundation
KR20110108441A Connects in phc pile control knockdown precast concrete block
KR20110087175A From first of all excavation reclamation methodof phc pickets will improve and the method will be able to the method
KR100957591B1 Concreate block, method for manufacturing concreate block and steel frame construction for using the concreate block, method for execution steel frame construction for using the concreate block
KR20110016052A The method which from site reinforces the end of steel girder with the concrete
KR100938918B1 Top-down construction method using steel frame by channel
KR20110009741A Reinforcement method of precast concrete girder is connected with steel column
KR20110007796A Reinforcement method of h-steel girder for floor height curtailment
KR20100113957A Joint structure and method for constructing slab of underground structures using the same
KR20100118482A To use reclamation steel perimeter beam and slab diaphragm effect in order for one side of the basement outer wall continuous construct was possible ,which the basement infrastructure construction method
KR20100118000A Using reclamation steel perimeter beam and girder which the basement infrastructure construction method
KR20100056341A Corrugated deck reinforced by plate and slab construction method using the same