Top-down construction method by whole support of retaining wall and form corresponding to uneven surface for using in the same
KR20120093699A
Using the reinforced mold encase steel beams and its construction method
KR20120088947A
The earth retaining wall construction method which uses H-Pile where attaches the parapin and H-Pile drawing method
KR101035404B1
Slurry wall and slab junction structure and its using top-down construction method
KR20120039439A
Synthetic pile wall using the h-steel and its construction method
KR20120052436A
Structures and production methods column mesh of slurry wall and construction method using a column mesh of slurry wall
KR20120040780A
Structural joint system for temporary cip retaining wall used a part of underground outer composite wall
KR20120035319A
Composite basement wall structual plan which uses temporary earth wall with underground construction outer wall parts and construction method
KR20120025945A
Reinforcement assembly of concrete file and building foundation
KR20110108441A
Connects in phc pile control knockdown precast concrete block
KR20110087175A
From first of all excavation reclamation methodof phc pickets will improve and the method will be able to the method
KR100957591B1
Concreate block, method for manufacturing concreate block and steel frame construction for using the concreate block, method for execution steel frame construction for using the concreate block
KR20110016052A
The method which from site reinforces the end of steel girder with the concrete
KR100938918B1
Top-down construction method using steel frame by channel
KR20110009741A
Reinforcement method of precast concrete girder is connected with steel column
KR20110007796A
Reinforcement method of h-steel girder for floor height curtailment
KR20100113957A
Joint structure and method for constructing slab of underground structures using the same
KR20100118482A
To use reclamation steel perimeter beam and slab diaphragm effect in order for one side of the basement outer wall continuous construct was possible ,which the basement infrastructure construction method
KR20100118000A
Using reclamation steel perimeter beam and girder which the basement infrastructure construction method
KR20100056341A
Corrugated deck reinforced by plate and slab construction method using the same