KR20090062665A
|
|
Polishing wheel
|
KR20090009562A
|
|
Grinding wheel
|
KR100463104B1
|
|
Pillar-shaped hardening structure formation equipment and the formation method of leading cement milk pressure injection
|
KR100469525B1
|
|
The replacement type pillar-shaped hardening structure formation equipment and the formation method of leading mortar jet
|
KR20050019579A
|
|
Inside hollow of abandoned structure filling method of construction using filling system and this
|
KR20050019580A
|
|
The waterproofing air-bubbles grouting method of construction for tunnel hollow filling
|
KR20040027254A
|
|
fiber combination method for structure repair and reforcement
|
KR20040048735A
|
|
Method for reinforcing a dam by layer compaction using high intensity public works texture
|
KR20040049070A
|
|
Structure coating method used of inorganic ceramics
|
KR20040034756A
|
|
Method for selecting proper waterproof method for underground structures
|
KR20040027235A
|
|
Polymer-ceramics hybrid coating materials and coating method to the surface of the concrete structures using the same
|
KR20040017514A
|
|
apparatus for easy examining waterproof of wall and grouting method for preventing leakage using the same
|
KR20020038643A
|
|
microbe carrier unit for waste water treatment
|
KR20030027346A
|
|
Construction method for installing concrete underground structures
|
KR20030002956A
|
|
Method of construction for installing a cut-off pipe in concrete structures
|
KR20010035221A
|
|
Hot-cold air providing system for green house effect
|
KR20000063100A
|
|
method of porpsity ceramic
|
KR20010110851A
|
|
Method for improvement of the bearing power of the soil for the soft soil and its device
|
KR20010103279A
|
|
Method for using an intermediate water supply by recycling subterranean water in build
|
KR20010092595A
|
|
Repair method for the brick up type leaking wall
|