CN111735736A
|
|
Method for rapidly and accurately detecting rock-fill dam rolling construction quality
|
CN111737804A
|
|
Method for monitoring, checking and accepting construction process of rock-fill dam filling and rolling
|
CN111593705A
|
|
New and old concrete dam arranged in close range in dangerous reservoir dam reconstruction project and method
|
CN111593788A
|
|
Method for realizing layered water taking by utilizing dam body to remove notch
|
CN111593839A
|
|
Single-slope drainage lateral lighting large-span sloping roof system of industrial factory building in cold region
|
CN111593704A
|
|
Anti-seepage structure of roller compacted concrete dam and construction method thereof
|
CN111366234A
|
|
Wireless vibration monitoring device for gate
|
CN111380451A
|
|
Wireless strain monitoring system for gate
|
CN111398027A
|
|
Rock-surrounding fracture joint testing device for geotechnical engineering model test
|
CN111220470A
|
|
Appearance is drawn to portable variable diameter stock
|
CN111042168A
|
|
Self-setting mortar plastic concrete anti-seepage wall forming process
|
CN110622643A
|
|
Ecological restoration method for rock slope in high-latitude severe cold region
|
CN110705188A
|
|
High-precision format simulation method for one-dimensional ice-water coupled motion
|
CN110646054A
|
|
Continuous automatic monitoring method for river water level in severe cold region
|
CN110207554A
|
|
A kind of blasting cavities method created high density and cover the lower chock blasting scope of freedom deeply
|
CN110055933A
|
|
A kind of severe cold area concrete dam anti-ice pulls out thermal-insulating leakage-resistant structure and its construction method
|
CN109460633A
|
|
The frozen soil spring, which melts, alleviates spring drought number of days quantitative approach
|
CN109440734A
|
|
A kind of prestressed concrete gate pier of replaceable supporting system
|
CN109371897A
|
|
A kind of fish pass import moisturizing energy dissipating model test apparatus and test method
|
CN109409721A
|
|
A kind of two-way across basin service reservoir group combined scheduling method
|