CN112211113A
|
|
Cast-in-place construction method for large-span diamond-shaped bent cap of high pier
|
CN112160770A
|
|
Tunnel reinforced concrete center ditch construction equipment and construction method thereof
|
CN112145214A
|
|
Energy-saving ventilation method for newly-built tunnel construction based on existing railway tunnel and inclined shaft
|
CN112045841A
|
|
Construction method of assembly type beam-making pedestal for prefabricating high-speed railway box beam
|
CN112045840A
|
|
Construction method of assembly type beam storage pedestal for prefabricating high-speed railway box beam
|
CN112095652A
|
|
Construction method of assembly type beam lifter foundation for high-speed railway box girder yard
|
CN112195995A
|
|
Milling and excavating machine grooving early warning device
|
CN111779496A
|
|
Novel subway shield tunneling portal gap plugging method
|
CN111779489A
|
|
Large-section tunnel construction method for ^ C-shaped section civil air defense section
|
CN111847972A
|
|
Anti-cracking reinforcing additive for pipe piece concrete and preparation method thereof
|
CN111673887A
|
|
Release agent spraying method of pipe piece die
|
CN111878114A
|
|
Repairing method for unfilled corner and cracked corner of shield segment
|
CN111873151A
|
|
Die cleaning method for tube sheet die
|
CN111778960A
|
|
Low-clearance water-rich sand-egg layer steel side mold secant pile construction method
|
CN111734445A
|
|
Tunnel secondary lining concrete left-right synchronous window-by-window pouring system and method
|
CN111733709A
|
|
Method for closing arched cable-stayed bridge beam in vertical rotation and downward rotation and bridge structure used in cooperation with method
|
CN111591318A
|
|
Heavy haul train locomotive dynamics monitoring devices
|
CN111411769A
|
|
Detachable integral large formwork for settlement joint of high-rise residential building and construction method
|
CN111251439A
|
|
Automatic and unmanned production system and production method for double-block type sleeper
|
CN111411970A
|
|
Shield starting construction method under water-rich sand layer geological condition
|